Skip to content
English
  • There are no suggestions because the search field is empty.

How to set up a cost structure?

A cost structure is characterized by a title, its parent cost structure and its positioning in the tree structure.

The cost structure corresponds to the defined gain type.

To define an cost structure  

  1. Go to Administration > P&L Analysis > Cost structures.
  2. Click on "New cost structure" in the right panel.
  3. Indicate its title (mandatory), it is also possible to choose its "Parent" structure, its position in the tree structure, as well as its status.
  4. Click on "Save" to save your cost structure.